Certified Healthcare Constructor (CHC) Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Study for the Certified Healthcare Constructor Test. Engage with flashcards and multiple choice questions, each with hints and explanations. Prepare effectively for your exam!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


Which of the following is NOT considered a construction activity that requires a fire watch?

  1. Welding

  2. Using a chop saw

  3. Electrical circuit testing

  4. All open flame work

The correct answer is: Electrical circuit testing

Fire watch is an essential safety measure in construction and various industrial activities primarily due to the risk of fire from hot work operations. It requires the monitoring of activities that could potentially ignite a fire, especially where sparks or open flames are involved. Welding and all open flame work pose significant fire hazards due to the heat and potential ignition sources they generate, making them activities that necessitate a fire watch. Similarly, using a chop saw can create sparks when cutting metal, also warranting a fire watch to ensure any ignited material is promptly managed. Electrical circuit testing, while it can produce sparks in certain contexts, typically does not involve direct open flames or extensive heat generation in the same manner as welding or cutting does. Therefore, it is often not categorized under activities necessitating a fire watch. Since it generally poses a lower risk of combustion compared to the other listed activities, it is recognized as the one not typically requiring a dedicated fire watch. This understanding underscores important distinctions in fire safety protocols in construction environments.